UK's BICS: Up to 25% Off Electricity — If You're Making Pellets, Not Flake

UK's BICS: Up to 25% Off Electricity — If You're Making Pellets, Not Flake

UK's BICS: Up to 25% Off Electricity — If You're Making Pellets, Not Flake

UK’s BICS graphic comparing eligible plastic pellets to non-eligible washed flake and regrind

The UK's BICS will cut electricity costs by up to 25% from April 2027 for energy-intensive manufacturers in Great Britain — but its final eligible-product list draws a sharp line through the plastics recycling chain: pellets qualify, washed flake and regrind don't. Applications close 30 November 2026.

The British Industrial Competitiveness Scheme (BICS) isn't aimed at plastics recycling specifically. It's a broad electricity-cost relief scheme for energy-intensive manufacturing in Great Britain, covering sectors from steel and chemicals to glass and automotive parts.

But its final eligible-product list, confirmed in a government spreadsheet published 25 August 2026, draws one line that matters a great deal to anyone buying or selling recycled plastic resin: pellets qualify. Washed flake and regrind don't.


UK BICS removes RO, FiT, and CM charges — relief up to £600M/year, key scheme dates

A manufacturing-electricity scheme, not a recycling subsidy

BICS exempts eligible sites from the indirect cost of three existing electricity-market mechanisms: the Renewables Obligation (RO), Feed-in Tariffs (FiT), and the Capacity Market (CM). None of these are plastics- or recycling-specific policies — they're general costs that sit on every UK electricity bill, and BICS removes them for sites that qualify.

Date

What happens

24 November 2025

Scheme first detailed; government estimates up to 25% off electricity bills, around £35–£40/MWh, for over 7,000 businesses

15 April 2026

Final scheme design published; eligibility expanded 40%, to over 10,000 businesses; a one-off 2027 payment added, backdating support to April 2026

25 August 2026

Final eligible-product and eligible-sector list (HS and SIC codes) published, version 3

1 October 2026

Application window opens

30 November 2026, 11:59pm

Application window closes

1 April 2027

RO and FiT exemptions take effect

1 October 2027

Capacity Market exemption takes effect

The relief itself is expected to be worth up to £600 million a year from April 2027, funded through a mix of changes to the energy system and Exchequer funding — the government's own description, with the detailed split due at Budget 2026. On top of the ongoing exemption, eligible firms get a one-off payment in 2027 covering "the support firms would have received if BICS had been in place from April 2026" — April 2026 to April 2027 being exactly the twelve months the ongoing exemption's own start date otherwise skips.


Four BICS eligibility tests — GB site, SIC code, HS product, 33 MWh/year — plus pro-rata exemption table

Four tests before any relief applies

Qualifying isn't just a matter of being an energy-intensive manufacturer. The guidance for applicants sets four criteria, and a business has to clear all four:

  • The manufacturing site is in Great Britain (Northern Ireland sites aren't covered by the criteria described in the guidance).

  • The business holds at least one eligible SIC code at Companies House.

  • The business manufactures a product corresponding to an eligible HS commodity code at that site.

  • The site uses at least 33 MWh of grid-supplied electricity a year (self-generated power doesn't count toward this threshold).

Clearing those four tests doesn't mean a 100% exemption, either. The size of the relief is pro-rated to how much of the site's total grid electricity actually goes toward manufacturing the eligible product:

Eligible production's share of site electricity

Exemption

25% or less

0%

More than 25%, less than 50%

50%

50% or more

100%

A site that splits its output evenly between an eligible product and something else gets a partial exemption. A site where eligible manufacturing is a side activity, at or under a quarter of total grid electricity use, gets nothing.


Plastic pellets (HS Chapter 39) eligible under BICS; washed flake and regrind (HS 3915) are not

Pellets are on the eligible list. Washed flake and regrind aren't.

This is where BICS becomes directly relevant to Great Britain-based buyers of recycled plastic resin, even though the scheme itself was never designed with plastics recycling in mind.

The final eligible-product spreadsheet lists products by six-digit HS commodity code. For plastics, the eligible codes sit in HS chapter 39's "primary forms" categories — the pellet and granule stage: 390110 and 390120 (polyethylene), 390210 (polypropylene), 390410 (PVC), and a long list of other primary-form polymer codes, alongside the matching eligible sector, SIC 2016, "Manufacture of plastics in primary forms."

What doesn't appear anywhere on that list is HS 3915 — "waste, parings and scrap, of plastics" — the code that covers washed plastic flake and regrind. It isn't there as an exclusion written into the rules; it simply never appears among the 1,845 eligible product rows in the published spreadsheet. Recovered paper (HS 4707) is absent in the same way.


Aluminium, ferrous, and glass scrap eligible under BICS; plastic scrap isn’t, recycled or not

Metal and glass scrap qualify. Plastic scrap doesn't — recycled or not.

That's a real asymmetry, and it's worth noticing precisely because BICS treats other recovered materials differently. Aluminium waste and scrap (HS 760200), ferrous waste and scrap (the HS 7204 series), and glass cullet, waste, or scrap (HS 700100) are all on the eligible list, scrap classification and all. Plastics are the one material in this group where only the next processing step up — compounding or extruding the recovered material into a primary-form pellet — brings a site into scope. Sorting and washing recovered plastic into clean flake, without pelletizing it, doesn't.

One more point worth being precise about: the HS codes themselves don't distinguish recycled from virgin material. A site compounding recycled HDPE into pellets and a site compounding virgin HDPE into pellets fall under the same commodity code. BICS isn't a recycled-content incentive — it's a manufacturing-activity test, and recycled-plastic pelletizing happens to pass it on the same terms as any other plastics-in-primary-form production.


Three BICS takeaways for GB buyers — apply by 30 Nov 2026, relief is pro-rated, applies to your own site

What this means for a GB-based buyer or converter sourcing recycled resin

This doesn't itself make a recycled resin supplier eligible for BICS, and it doesn't change how recycled HDPE, LDPE, or PP is shipped or classified for export. BICS relief runs to the manufacturer's own site, not to a resin supplier upstream of it. The relevant question is whether a Great Britain-based buyer's own site — the one that compounds, extrudes, or otherwise manufactures recycled HDPE, LDPE, or PP into its own primary-form pellets, rather than simply washing and reselling flake — clears the SIC, HS, and 33 MWh tests, with a large enough share of its site electricity going to that production.

A few things are worth flagging to anyone in that position:

  • The application window is short and closes soon — 30 November 2026, 11:59pm — relative to when this scheme was first announced over a year earlier.

  • Eligibility is pro-rated, not all-or-nothing. A site mixing eligible pelletizing with other, non-eligible activity on the same grid connection needs to work out its actual eligible-production share before assuming it clears the 50% threshold for full relief.

  • The SIC/HS test is specific to the finished product leaving the site, not to the feedstock. A buyer sourcing Regenport's recycled LDPE, HDPE, or PP as feedstock for its own pelletizing line should confirm its own SIC and HS classification directly with the scheme's guidance — this post is background, not a substitute for that check.


UK BICS FAQ — exempt charges, start dates, flake eligibility, recycled vs. virgin rules

Frequently Asked Questions

What exactly does BICS exempt a business from? The indirect cost of three existing UK electricity-market charges: the Renewables Obligation, Feed-in Tariffs, and the Capacity Market — not from electricity bills generally.

When does the relief actually start? Renewables Obligation and Feed-in Tariff exemptions apply from 1 April 2027. The Capacity Market exemption follows from 1 October 2027. A separate one-off payment in 2027 backdates support to April 2026.

Does washed, sorted recycled plastic flake qualify? Not on its own. The final eligible-product list covers plastics in primary form (HS chapter 39 pellet/granule codes), not HS 3915, the code for plastic waste and scrap that covers washed flake and regrind.

Does the scheme distinguish recycled plastic from virgin plastic? No. Eligibility runs on the HS commodity code and manufacturing activity (SIC 2016 and related codes), not on recycled content. A recycled-PE pelletizing line and a virgin-PE pelletizing line are tested the same way.

Is it too late to apply? As of this post, the application window is open but closes 30 November 2026 at 11:59pm — check the current guidance for the latest status, since this post reflects the window as published.


About this guide

Current as of November 2026, for general information only — not legal, tax, or energy-cost advice. Eligibility determinations, SIC/HS classifications, and electricity-share calculations should be verified against the current BICS guidance for applicants and the official eligibility spreadsheet before relying on any figure in this post for a business decision.


Image generated with ChatGPT

Sources

Department for Business and Trade (gov.uk), "British Industrial Competitiveness Scheme: guidance for applicants" — eligibility criteria, 33 MWh threshold, pro-rata exemption bands, application window → Read the Source

Department for Business and Trade (gov.uk), "Eligibility for the British Industrial Competitiveness Scheme" — final eligible HS/SIC code list (v3, 25 Aug 2026) → Read the Source

Gov.uk press release, "Government acts on top business concern and cuts electricity bills for thousands of manufacturers by up to 25%" (24 Nov 2025) — original 25% / £35–£40 per MWh estimate, RO/FiT/CM structure → Read the Source

Gov.uk press release, "Government cuts electricity bill for 10,000 manufacturers in boost for UK competitiveness" (15 Apr 2026) — 10,000-business expansion, £600M/year estimate, 2027 backdated payment → Read the Source

The British Industrial Competitiveness Scheme (BICS) isn't aimed at plastics recycling specifically. It's a broad electricity-cost relief scheme for energy-intensive manufacturing in Great Britain, covering sectors from steel and chemicals to glass and automotive parts.

But its final eligible-product list, confirmed in a government spreadsheet published 25 August 2026, draws one line that matters a great deal to anyone buying or selling recycled plastic resin: pellets qualify. Washed flake and regrind don't.


UK BICS removes RO, FiT, and CM charges — relief up to £600M/year, key scheme dates

A manufacturing-electricity scheme, not a recycling subsidy

BICS exempts eligible sites from the indirect cost of three existing electricity-market mechanisms: the Renewables Obligation (RO), Feed-in Tariffs (FiT), and the Capacity Market (CM). None of these are plastics- or recycling-specific policies — they're general costs that sit on every UK electricity bill, and BICS removes them for sites that qualify.

Date

What happens

24 November 2025

Scheme first detailed; government estimates up to 25% off electricity bills, around £35–£40/MWh, for over 7,000 businesses

15 April 2026

Final scheme design published; eligibility expanded 40%, to over 10,000 businesses; a one-off 2027 payment added, backdating support to April 2026

25 August 2026

Final eligible-product and eligible-sector list (HS and SIC codes) published, version 3

1 October 2026

Application window opens

30 November 2026, 11:59pm

Application window closes

1 April 2027

RO and FiT exemptions take effect

1 October 2027

Capacity Market exemption takes effect

The relief itself is expected to be worth up to £600 million a year from April 2027, funded through a mix of changes to the energy system and Exchequer funding — the government's own description, with the detailed split due at Budget 2026. On top of the ongoing exemption, eligible firms get a one-off payment in 2027 covering "the support firms would have received if BICS had been in place from April 2026" — April 2026 to April 2027 being exactly the twelve months the ongoing exemption's own start date otherwise skips.


Four BICS eligibility tests — GB site, SIC code, HS product, 33 MWh/year — plus pro-rata exemption table

Four tests before any relief applies

Qualifying isn't just a matter of being an energy-intensive manufacturer. The guidance for applicants sets four criteria, and a business has to clear all four:

  • The manufacturing site is in Great Britain (Northern Ireland sites aren't covered by the criteria described in the guidance).

  • The business holds at least one eligible SIC code at Companies House.

  • The business manufactures a product corresponding to an eligible HS commodity code at that site.

  • The site uses at least 33 MWh of grid-supplied electricity a year (self-generated power doesn't count toward this threshold).

Clearing those four tests doesn't mean a 100% exemption, either. The size of the relief is pro-rated to how much of the site's total grid electricity actually goes toward manufacturing the eligible product:

Eligible production's share of site electricity

Exemption

25% or less

0%

More than 25%, less than 50%

50%

50% or more

100%

A site that splits its output evenly between an eligible product and something else gets a partial exemption. A site where eligible manufacturing is a side activity, at or under a quarter of total grid electricity use, gets nothing.


Plastic pellets (HS Chapter 39) eligible under BICS; washed flake and regrind (HS 3915) are not

Pellets are on the eligible list. Washed flake and regrind aren't.

This is where BICS becomes directly relevant to Great Britain-based buyers of recycled plastic resin, even though the scheme itself was never designed with plastics recycling in mind.

The final eligible-product spreadsheet lists products by six-digit HS commodity code. For plastics, the eligible codes sit in HS chapter 39's "primary forms" categories — the pellet and granule stage: 390110 and 390120 (polyethylene), 390210 (polypropylene), 390410 (PVC), and a long list of other primary-form polymer codes, alongside the matching eligible sector, SIC 2016, "Manufacture of plastics in primary forms."

What doesn't appear anywhere on that list is HS 3915 — "waste, parings and scrap, of plastics" — the code that covers washed plastic flake and regrind. It isn't there as an exclusion written into the rules; it simply never appears among the 1,845 eligible product rows in the published spreadsheet. Recovered paper (HS 4707) is absent in the same way.


Aluminium, ferrous, and glass scrap eligible under BICS; plastic scrap isn’t, recycled or not

Metal and glass scrap qualify. Plastic scrap doesn't — recycled or not.

That's a real asymmetry, and it's worth noticing precisely because BICS treats other recovered materials differently. Aluminium waste and scrap (HS 760200), ferrous waste and scrap (the HS 7204 series), and glass cullet, waste, or scrap (HS 700100) are all on the eligible list, scrap classification and all. Plastics are the one material in this group where only the next processing step up — compounding or extruding the recovered material into a primary-form pellet — brings a site into scope. Sorting and washing recovered plastic into clean flake, without pelletizing it, doesn't.

One more point worth being precise about: the HS codes themselves don't distinguish recycled from virgin material. A site compounding recycled HDPE into pellets and a site compounding virgin HDPE into pellets fall under the same commodity code. BICS isn't a recycled-content incentive — it's a manufacturing-activity test, and recycled-plastic pelletizing happens to pass it on the same terms as any other plastics-in-primary-form production.


Three BICS takeaways for GB buyers — apply by 30 Nov 2026, relief is pro-rated, applies to your own site

What this means for a GB-based buyer or converter sourcing recycled resin

This doesn't itself make a recycled resin supplier eligible for BICS, and it doesn't change how recycled HDPE, LDPE, or PP is shipped or classified for export. BICS relief runs to the manufacturer's own site, not to a resin supplier upstream of it. The relevant question is whether a Great Britain-based buyer's own site — the one that compounds, extrudes, or otherwise manufactures recycled HDPE, LDPE, or PP into its own primary-form pellets, rather than simply washing and reselling flake — clears the SIC, HS, and 33 MWh tests, with a large enough share of its site electricity going to that production.

A few things are worth flagging to anyone in that position:

  • The application window is short and closes soon — 30 November 2026, 11:59pm — relative to when this scheme was first announced over a year earlier.

  • Eligibility is pro-rated, not all-or-nothing. A site mixing eligible pelletizing with other, non-eligible activity on the same grid connection needs to work out its actual eligible-production share before assuming it clears the 50% threshold for full relief.

  • The SIC/HS test is specific to the finished product leaving the site, not to the feedstock. A buyer sourcing Regenport's recycled LDPE, HDPE, or PP as feedstock for its own pelletizing line should confirm its own SIC and HS classification directly with the scheme's guidance — this post is background, not a substitute for that check.


UK BICS FAQ — exempt charges, start dates, flake eligibility, recycled vs. virgin rules

Frequently Asked Questions

What exactly does BICS exempt a business from? The indirect cost of three existing UK electricity-market charges: the Renewables Obligation, Feed-in Tariffs, and the Capacity Market — not from electricity bills generally.

When does the relief actually start? Renewables Obligation and Feed-in Tariff exemptions apply from 1 April 2027. The Capacity Market exemption follows from 1 October 2027. A separate one-off payment in 2027 backdates support to April 2026.

Does washed, sorted recycled plastic flake qualify? Not on its own. The final eligible-product list covers plastics in primary form (HS chapter 39 pellet/granule codes), not HS 3915, the code for plastic waste and scrap that covers washed flake and regrind.

Does the scheme distinguish recycled plastic from virgin plastic? No. Eligibility runs on the HS commodity code and manufacturing activity (SIC 2016 and related codes), not on recycled content. A recycled-PE pelletizing line and a virgin-PE pelletizing line are tested the same way.

Is it too late to apply? As of this post, the application window is open but closes 30 November 2026 at 11:59pm — check the current guidance for the latest status, since this post reflects the window as published.


About this guide

Current as of November 2026, for general information only — not legal, tax, or energy-cost advice. Eligibility determinations, SIC/HS classifications, and electricity-share calculations should be verified against the current BICS guidance for applicants and the official eligibility spreadsheet before relying on any figure in this post for a business decision.


Image generated with ChatGPT

Sources

Department for Business and Trade (gov.uk), "British Industrial Competitiveness Scheme: guidance for applicants" — eligibility criteria, 33 MWh threshold, pro-rata exemption bands, application window → Read the Source

Department for Business and Trade (gov.uk), "Eligibility for the British Industrial Competitiveness Scheme" — final eligible HS/SIC code list (v3, 25 Aug 2026) → Read the Source

Gov.uk press release, "Government acts on top business concern and cuts electricity bills for thousands of manufacturers by up to 25%" (24 Nov 2025) — original 25% / £35–£40 per MWh estimate, RO/FiT/CM structure → Read the Source

Gov.uk press release, "Government cuts electricity bill for 10,000 manufacturers in boost for UK competitiveness" (15 Apr 2026) — 10,000-business expansion, £600M/year estimate, 2027 backdated payment → Read the Source

Explore Related Materials

Grades • Specs • Availability

Browse rLDPE →

Explore Related Materials

Explore Related Materials

Recycled LDPE grades with feedstock origin and recycled-content documentation for review.

Recycled LDPE grades with feedstock origin and recycled-content documentation for review.

Browse rLDPE →

Browse rLDPE →

Posted by REGENPORT

REGENPORT is a global platform connecting buyers and suppliers in the recycled materials and sustainable packaging industries.

Find Your Recycled Material
on REGENPORT

Find Your Recycled Material
on REGENPORT

Browse verified PCR/PIR grades, real-time pricing, and request a quote directly on our platform.

Browse verified PCR/PIR grades, real-time pricing, and request a quote directly on our platform.

CONTACT OUR TEAM

CONTACT OUR TEAM

sales@e-connect.kr

sales@e-connect.kr

We typically respond within 24 hours.

We typically respond within 24 hours.

Technical
Datasheet

Technical
Datasheet

Sample
Request

Sample
Request

Get a Quote

Get a Quote

Check
Availability

Check
Availability

Regenport

Verified recycled plastic materials

for resin manufacturers

and compounders.

CONTACT US

+82 70-7594-2321

450, Gangnam-daero,

Gangnam-gu, Seoul 06123,

Republic of Korea

Privacy Policy

Terms of Service

All Posts

© 2026 REGENPORT Inc. All rights reserved.

Regenport

Verified recycled plastic materials

for resin manufacturers

and compounders.

CONTACT US

+82 70-7594-2321

450, Gangnam-daero,

Gangnam-gu, Seoul 06123,

Republic of Korea

Privacy Policy

Terms of Service

All Posts

© 2026 REGENPORT Inc. All rights reserved.

Regenport

© 2026 REGENPORT Inc. All rights reserved.

Privacy Policy

Terms of Service

All Posts

Find Your Recycled Material on

REGENPORT

Browse verified PCR/PIR grades, real-time pricing, and request a quote directly on our platform.

CONTACT OUR TEAM

sales@e-connect.kr

We typically respond within 24 hours.